New Elevetor for a new jewellery production facility in Italy
The new production facility for the jewellery industry features New Elevetor.
As part of the project, New Elevetor was used to create an elevated foundation system, forming a ventilated void beneath the concrete slab. Its modular elements can be assembled quickly on site and adapted to different heights, providing a practical solution for foundation construction.
New Elevetor also allows the foundation to be built with less concrete than traditional solid fill solutions, while its adjustable height makes it suitable for different construction requirements.
Learn more
New Elevetor
New Elevetor downloads
Copyright Carron